Installation of Transformer on Poles

08/27/2015 1:20 AM

Calculation of materials for the installation of 74 pole mounted xformer on a 10.7km route. How do I calculate the total number of Stays, Fiber cross Arm, disulators, Pot insulaators, Tie straps Stay blocks, Thimbles, etc

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#1

Re: Installation of Teansformer on Poles

08/27/2015 4:19 AM

Use a calculator, common sense, and the brain in your head.

I weep for your customers. They have been cheated.

Register to Reply
Active Contributor

Join Date: Oct 2010
Location: Keffi,Nigeria
Posts: 18
Good Answers: 1
#2
In reply to #1

Re: Installation of Teansformer on Poles

08/27/2015 5:40 AM

@ Lyn, I just wanted to have an idea coz I stumbled into a drawing, so I decided to see if I could be able to do the estimate. I don't ve any costumers to cheat. I want to know as an Engineer. I believe its not avwrong thing fore to ask? I want to learn more & gain more experience. Pls is there anybody out there who could assist me. Thanking you in anticipation.

Register to Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#5
In reply to #2

Re: Installation of Teansformer on Poles

08/27/2015 10:21 AM

It seems that it is just a matter of looking at the drawing and writing down each item you see then.

Register to Reply
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#3

Re: Installation of Teansformer on Poles

08/27/2015 7:27 AM

It depends on too many things to describe easily in brief on-line posts. Stays will typically be required at any change of direction of the trunk line, at the ends of the line, and at any weakly anchored poles.

Your country or region should have a power transmission line code that specifies such information, which may not be included in electrical codes governing in-building wiring.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Register to Reply
Guru
Engineering Fields - Power Engineering - New Member

Join Date: May 2007
Location: NYC metropolitan area.
Posts: 3230
Good Answers: 444
#4

Re: Installation of Teansformer on Poles

08/27/2015 9:21 AM

Since you have drawings and this is a training exercise, do what is known as a MTO (Material Take Off) using one of the drawings that is typical of most of the poles. The MTO is a comprehensive list of every single item that is used to construct the pole and its attachments, you then count up each piece and add the total.

You will have to make an estimate for the stays and the hardware required to steady the pole since, as Tornado has pointed out, they are a function of the route and terrain that the poles go through. Most utilities have a set of construction standards that contain all the information and rules for your project.

__________________
“Tell me and I forget. Teach me and I remember. Involve me and I learn.” Ben Franklin.
Register to Reply Score 1 for Good Answer
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#6

Re: Installation of Teansformer on Poles

08/27/2015 1:44 PM

All one does is compare the drawing with the standards and the plan of the route, and counts things up. Over-estimate to allow for breakage and wastage (i.e. "theft") so that the job is not held up for want of materials near the end, the delay for which can be worth rather more than the missing materials.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply Score 1 for Good Answer
Guru

Join Date: Feb 2008
Location: Large hole formally occupied by furry woodland creature.
Posts: 3385
Good Answers: 97
#7

Re: Installation of Teansformer on Poles

08/27/2015 2:28 PM

Consider factoring in parrot control.

__________________
CRTL-Z
Register to Reply
Guru

Join Date: Jul 2006
Location: CA (Central Arkansas, USA)
Posts: 599
Good Answers: 10
#8

Re: Installation of Transformer on Poles

08/28/2015 11:39 AM

Make a list of what you need for 1 installation, multiply by 74? -- JHF

Trick question of the day: How many cams does a Single Overhead Cam Ford motor have?

__________________
If it's too good to be true, it probably isn't
Register to Reply
Power-User

Join Date: Nov 2011
Location: New Hampshire
Posts: 406
Good Answers: 3
#9
In reply to #8

Re: Installation of Transformer on Poles

08/28/2015 5:10 PM

All that is needed in that situation

Register to Reply
2
Active Contributor

Join Date: Oct 2010
Location: Keffi,Nigeria
Posts: 18
Good Answers: 1
#10

Re: Installation of Transformer on Poles

08/29/2015 6:49 AM

Dear All, i just want to say thank you so much for your positive contributions. I sincerely appreciate them.

Register to Reply Good Answer (Score 2)
Register to Reply 10 comments

Good Answers:

These comments received enough positive votes to make them "good answers".

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

Circuit Breaker (1); komez (2); lyn (2); Munster (1); PWSlack (1); RAMConsult (1); Tornado (1); Unredundant (1)

Previous in Forum: One and Half Breaker Scheme Protection CTs   Next in Forum: Deep Water Electronic Communication

Advertisement