Boundry wall

11/20/2007 12:10 AM

Can anybody tell me weather we can construct 29 Km long boundry wall in 3 months of hight 3.5m above ground & the piling is 3m below ground.....?

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Popular Science - Biology - New Member Hobbies - Musician - New Member APIX Pilot Plant Design Project - Member - New Member Hobbies - CNC - New Member Fans of Old Computers - ZX-81 - New Member

Join Date: Jan 2007
Location: Centurion, South Africa
Posts: 3921
Good Answers: 97
#1

Re: Boundry wall

11/20/2007 3:01 AM

It should be possible to complete the wall in 3 months if enough resources are applied.

On 29km you may encounter a lot of different terrains all having an influence.

The material used, soil or rock type at the excavations, other type of anomalies will all have an influence.

What are the delivery situation of cement etc like?

__________________
Never do today what you can put of until tomorrow - Student motto
Register to Reply
Member
Engineering Fields - Power Engineering - New Member

Join Date: Dec 2006
Posts: 9
#2
In reply to #1

Re: Boundry wall

11/20/2007 4:42 AM

ya sir increasing the resources is one option but we are looking for the new technologies by which the limited resources can also be able to perform with the same intensity

because in our case raw material supply is not an issue.

Register to Reply Off Topic (Score 5)
Guru
Engineering Fields - Systems Engineering - New Member Hobbies - Model Rocketry - New Member

Join Date: Dec 2006
Location: Long.92E,Lat.26N
Posts: 1336
Good Answers: 14
#3
In reply to #2

Re: Boundry wall

11/20/2007 9:59 PM

How to do at :

  • 20% budget
  • 20% time
  • Equally viewproof psychological barrier of Concrete 3.5 m high

Come see at Guwahati.My design/execution--6 years --standing

My mobile (0)98540 22988

Register to Reply Off Topic (Score 5)
Member
Engineering Fields - Power Engineering - New Member

Join Date: Dec 2006
Posts: 9
#4
In reply to #3

Re: Boundry wall

11/21/2007 3:28 AM

Thanks for your reply.

Please suggest various alternatives for construction of boundary wall based on the following criteria.

length and height of Boundary wall :29 KM ,3.5 m above NGL

Time for completion: 3 months

budget allocated : 45 lakhs per KM

soil condition: clayey soil, standard penetration test N value=2

period of construction: non monsoon

Expected piling depth :9 m below NGL

deployement of manpower,machinery,materials for construction: Average

reply awaited.

Register to Reply Off Topic (Score 5)
Guru

Join Date: Aug 2007
Posts: 548
#5
In reply to #4

Re: Boundry wall

11/21/2007 2:28 PM

...it is possible to built such structures within or less than 3 months if you have survyed the area and know all the natural herdles plus infrastructures you posses with latest machinery and supplies ....get resources multipled if required.... thank you

Register to Reply Off Topic (Score 5)
Guru
Engineering Fields - Systems Engineering - New Member Hobbies - Model Rocketry - New Member

Join Date: Dec 2006
Location: Long.92E,Lat.26N
Posts: 1336
Good Answers: 14
#6
In reply to #4

Re: Boundry wall

11/21/2007 9:13 PM

My system will exceed your expectations.

Just appear at Guwahati Airport and 'phone me from there. Site is 2Km from the airport.You can take the flight out after 3 Hours.

You must see the 300m x2m HI wall to get full confidence.

BR

MM

Register to Reply Off Topic (Score 5)
Anonymous Poster
#7
In reply to #1

Re: Boundry wall

11/22/2007 4:46 AM

No problems you can build only 1800m with one crane what is the height of the wall ,if you tell i can advise

29 kms you need to have 10 cranes and 10 groups to build it in 3 months

Precast you should allow 2 months and optimise on installation

50% sub it out for a precaster to cope up

You acn make it

suresh

Register to Reply
Register to Reply 7 comments
Copy to Clipboard

Users who posted comments:

Anonymous Poster (1); Girish Bhave (2); Hendrik (1); MUKULMAHANT (2); vikas (1)

Previous in Forum: La Land Surveying   Next in Forum: Simple Beam Calculation

Advertisement