oil storage tanks

10/05/2008 8:02 AM
  • curently i m working on the project of construction of oil terminal having mutliple oil storage tank from 22Metric Ton to 30000Metric Ton. we are using for shell ASTM A-36 plates for D Door ( sludge door) do we need heat treatment of it before erection ?
  • except porosity, root under cut, hi-lo, pits formation are there any major more defects that are needed to be reapir during welding process. ?
Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".
Guru

Join Date: Dec 2006
Location: Hop around Toronto, New York & Karachi
Posts: 1876
Good Answers: 19
#1

Re: oil storage tanks

10/06/2008 1:49 AM

Contact Abdel Halem Galala - he is an expert on this.

__________________
I not only use all the brains that I have, but all that I can borrow. Woodrow Wilson
Register to Reply
Guru

Join Date: Dec 2006
Location: Hop around Toronto, New York & Karachi
Posts: 1876
Good Answers: 19
#2
In reply to #1

Re: oil storage tanks

10/06/2008 1:51 AM

Sorry Abdel Halim Galala

__________________
I not only use all the brains that I have, but all that I can borrow. Woodrow Wilson
Register to Reply
3
Guru
Engineering Fields - Piping Design Engineering - New Member Egypt - Member - Member since 02/18/2007

Join Date: Feb 2007
Location: Cairo, Egypt
Posts: 1733
Good Answers: 248
#3

Re: oil storage tanks

10/06/2008 2:55 AM

Tank you ducon, you are welcome.

A. As noted from Table 2-3a—Material Groups of API 650, the material ASTM A36 is located under two columns:

Group I As Rolled, Semikilled (must be semikilled or killed & Thickness ≤ 20 mm).

Group II As Rolled, Killed or Semikilled (Manganese content shall be 0.80–1.2% by heat analysis for thicknesses greater than 20 mm, except that for each reduction of 0.01% below the specified carbon maximum, an increase of 0.06% manganese above the specified maximum will be permitted up to the maximum of 1.35%. Thicknesses ≤ 20 mm shall have a manganese content of 0.8–1.2% by heat analysis).

From above we discover that ther is no any recommendation for proceeding a heat treatment (normalizing) for ASTM A36 before erection. Only there is my recommendation to proceed a preheating before welding to avoid heat choking and to avoid formulation of H2 entrapped to your weldment.

B. There are a lot of weld defects, the following handbooks are free downloading and will be very interesting to you in that subject:

• Welding Manual

• Gas Tungsten Arc Welding (TIG) Handbook

• Guidelines for Shielded Metal Arc Welding (SMAW)

• Guidelines for Gas Tungsten Arc Welding (GTAW)

• Guidelines for Gas Metal Arc Welding (GMAW)

• Submerged Arc Welding

• Resistance Spot Welding

• Stainless Steels - Their properties and their suitability for welding

• Underwater Cutting and Welding Manual

__________________
It is better to be defeated on principles, than to win on lies!
Register to Reply Good Answer (Score 3)
Guru

Join Date: Dec 2006
Location: Hop around Toronto, New York & Karachi
Posts: 1876
Good Answers: 19
#4
In reply to #3

Re: oil storage tanks

10/07/2008 1:07 PM

Please check my reply on his recent thread "Answer them Plz".

__________________
I not only use all the brains that I have, but all that I can borrow. Woodrow Wilson
Register to Reply
Guru
Engineering Fields - Systems Engineering - New Member Hobbies - Model Rocketry - New Member

Join Date: Dec 2006
Location: Long.92E,Lat.26N
Posts: 1336
Good Answers: 14
#5

Re: oil storage tanks

10/20/2008 9:34 AM

Can I butt in -- with very brief replies?

#1 D Door ( sludge door) do we need heat treatment of it before erection

  • Tank Plate material is chosen for Good Welded strength ONLY.--
  • These plates are not hardenable-- in the sense of machined/grinded parts
  • So gaskets take care of possible non-parallelism.
  • Heat treatment will be pointless.
  • You can install a gate valve here instead.

#2 except porosity, root under cut, hi-lo, pits--Make sure -none of these happen.

#3 reapir during welding process__ Plan your Vertical weld with :

MIG-MAG /SAW/ELECTROSLAG so that you will never need repairs. Possible.

mm

Register to Reply
Register to Reply 5 comments

Good Answers:

These comments received enough positive votes to make them "good answers".
Copy to Clipboard

Users who posted comments:

Abdel Halim Galala (1); ducon (3); MUKULMAHANT (1)

Previous in Forum: project on robotics   Next in Forum: canned pumps
You might be interested in: Door Operators, Door Stays and Lid Stays

Advertisement