oil storage tanks

10/05/2008 8:02 AM
  • curently i m working on the project of construction of oil terminal having mutliple oil storage tank from 22Metric Ton to 30000Metric Ton. we are using for shell ASTM A-36 plates for D Door ( sludge door) do we need heat treatment of it before erection ?
  • except porosity, root under cut, hi-lo, pits formation are there any major more defects that are needed to be reapir during welding process. ?
Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".
Guru

Join Date: Dec 2006
Location: Hop around Toronto, New York & Karachi
Posts: 1876
Good Answers: 19
#1

Re: oil storage tanks

10/06/2008 1:49 AM

Contact Abdel Halem Galala - he is an expert on this.

__________________
I not only use all the brains that I have, but all that I can borrow. Woodrow Wilson
Register to Reply
Guru

Join Date: Dec 2006
Location: Hop around Toronto, New York & Karachi
Posts: 1876
Good Answers: 19
#2
In reply to #1

Re: oil storage tanks

10/06/2008 1:51 AM

Sorry Abdel Halim Galala

__________________
I not only use all the brains that I have, but all that I can borrow. Woodrow Wilson
Register to Reply
3
Guru
Engineering Fields - Piping Design Engineering - New Member Egypt - Member - Member since 02/18/2007

Join Date: Feb 2007
Location: Cairo, Egypt
Posts: 1733
Good Answers: 248
#3

Re: oil storage tanks

10/06/2008 2:55 AM

Tank you ducon, you are welcome.

A. As noted from Table 2-3a—Material Groups of API 650, the material ASTM A36 is located under two columns:

Group I As Rolled, Semikilled (must be semikilled or killed & Thickness ≤ 20 mm).

Group II As Rolled, Killed or Semikilled (Manganese content shall be 0.80–1.2% by heat analysis for thicknesses greater than 20 mm, except that for each reduction of 0.01% below the specified carbon maximum, an increase of 0.06% manganese above the specified maximum will be permitted up to the maximum of 1.35%. Thicknesses ≤ 20 mm shall have a manganese content of 0.8–1.2% by heat analysis).

From above we discover that ther is no any recommendation for proceeding a heat treatment (normalizing) for ASTM A36 before erection. Only there is my recommendation to proceed a preheating before welding to avoid heat choking and to avoid formulation of H2 entrapped to your weldment.

B. There are a lot of weld defects, the following handbooks are free downloading and will be very interesting to you in that subject:

Welding Manual

Gas Tungsten Arc Welding (TIG) Handbook

Guidelines for Shielded Metal Arc Welding (SMAW)

Guidelines for Gas Tungsten Arc Welding (GTAW)

Guidelines for Gas Metal Arc Welding (GMAW)

Submerged Arc Welding

Resistance Spot Welding

Stainless Steels - Their properties and their suitability for welding

Underwater Cutting and Welding Manual

__________________
It is better to be defeated on principles, than to win on lies!
Register to Reply Good Answer (Score 3)
Guru

Join Date: Dec 2006
Location: Hop around Toronto, New York & Karachi
Posts: 1876
Good Answers: 19
#4
In reply to #3

Re: oil storage tanks

10/07/2008 1:07 PM

Please check my reply on his recent thread "Answer them Plz".

__________________
I not only use all the brains that I have, but all that I can borrow. Woodrow Wilson
Register to Reply
Guru
Engineering Fields - Systems Engineering - New Member Hobbies - Model Rocketry - New Member

Join Date: Dec 2006
Location: Long.92E,Lat.26N
Posts: 1336
Good Answers: 14
#5

Re: oil storage tanks

10/20/2008 9:34 AM

Can I butt in -- with very brief replies?

#1 D Door ( sludge door) do we need heat treatment of it before erection

  • Tank Plate material is chosen for Good Welded strength ONLY.--
  • These plates are not hardenable-- in the sense of machined/grinded parts
  • So gaskets take care of possible non-parallelism.
  • Heat treatment will be pointless.
  • You can install a gate valve here instead.

#2 except porosity, root under cut, hi-lo, pits--Make sure -none of these happen.

#3 reapir during welding process__ Plan your Vertical weld with :

MIG-MAG /SAW/ELECTROSLAG so that you will never need repairs. Possible.

mm

Register to Reply
Register to Reply 5 comments

Good Answers:

These comments received enough positive votes to make them "good answers".
Copy to Clipboard

Users who posted comments:

Abdel Halim Galala (1); ducon (3); MUKULMAHANT (1)

Previous in Forum: project on robotics   Next in Forum: canned pumps
You might be interested in: Door Operators, Door Stays and Lid Stays

Advertisement