Anonymous Poster

Pressure Reducing Station - Operating Duration

11/20/2009 1:55 AM

Whether pressure reducing station (either of pilot operated or spring loaded) having following duty parameter can be recomended & selected for continuous duty operation :

Fluid : Raw water for cooling purpose.

Pressure reduction : From 20 Bar (g) to 6 Bar (g)

Flow capacity : 650 m3/Hr.

Applcation : Hydro power plant.

Water quality : Silt level may vary from 2000 ppm to 5000 ppm.

Ignoring energy aspect because this 20 bar pressure at inlet is in abundance and without any charge, tapped from penstock after main inlet valve of hydro turbine.

Pumping option is being avoided to reduce additional investment.

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: Pressure Reducing station-Operating duration.

11/20/2009 3:09 AM

Those figures suggest a continuous energy loss approaching 253kW.

Could a back-pressure turbine or a pressure exchanger be used instead of a pressure reducing station, in order to recover some of this energy?

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply Score 1 for Good Answer
Anonymous Poster
#2
In reply to #1

Re: Pressure Reducing station-Operating duration.

11/20/2009 3:27 AM

The topic of the discussion is clearly shows the intension of the participant to avoid (optimize) any additional capital expenditure, be it pump,turbine or pressure exchnager etc AND whether pressure reducing station for continuous duty operation is recomended or not ?

Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#3
In reply to #2

Re: Pressure Reducing station-Operating duration.

11/20/2009 3:43 AM

At, say, £0.1GBP/kWh, there is an opportunity to recover over £220kGBP of energy. Capital cost is one of many considerations the original poster needs to consider in selecting the correct installation for the job at hand.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#5
In reply to #3

Re: Pressure Reducing station-Operating duration.

11/20/2009 4:10 AM

over £220kGBP of energy per annum

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Anonymous Poster
#8
In reply to #1

Re: Pressure Reducing station-Operating duration.

11/21/2009 1:56 AM

I am eager to learn more about pressure exchanger- This is something new to me, please provide basic operating principle.

Also, back pressure hydro turbine is again new thing.For steam application back pressure turbine is understood but for hydro turbine in will be interesting to add some more information.

Please help.

Reply
Guru
Engineering Fields - Mechanical Engineering - New Member Hobbies - CNC - New Member

Join Date: Aug 2006
Location: Western Australia
Posts: 767
Good Answers: 58
#9
In reply to #8

Re: Pressure Reducing station-Operating duration.

11/23/2009 1:45 AM

The cheapest way to drop the pressure and at the same time recover a lot of the power is to use a pretty standard Pump As Turbine (PAT). Plenty of information on the internet - try this one for starters

__________________
If you can't explain it simply, you don't understand it well enough. (A.E.)
Reply Score 1 for Good Answer
Anonymous Poster
#11
In reply to #9

Re: Pressure Reducing station-Operating duration.

11/23/2009 3:18 AM

Very Nice & useful information regarding PAT, however here query has been asked by the participant not about energy saving or other possible alternative of mechanical equipment but technical recommendation & selection of continuous operating duty pressure reducing station.

Whether PRS can be recommended for continuous duty operation in cooling water circuit having silt level 2000 ppm to 5000ppm ?

Reply Score 1 for Off Topic
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#4

Re: Pressure Reducing station-Operating duration.

11/20/2009 4:05 AM

Intriguing problem. Alas, I use non-SI units, so I will be doing a few conversions that should be checked.

First, the 20-to-6 bar reduction seems reasonable for a single stage. (300-to-90 psi in my world.) But hold it a minute: 300 psi x 2.31 ft/psi = 693 ft of head. What dam is this, anyway--Hoover, Three Gorges...?? Well, just a reality check.

650 m3/h x 265 g/m3 x 1 h/60 m = 2871 gpm. If we limit velocity to 4 ft/s to control pipe erosion with this amount of silt, we get 17.12-inch pipe; call it 450 mm or 18". The valve will be smaller. Flow = Cv x √ΔP; Cv = 2871/√(300-90) = 198.1; say 200.

I will come back to this again and look it up. I don't know what is available in abrasive-resistant regulators, which might entail elastomer rather than metal fluid-contact parts. In any case, this regulator won't be huge, and even a custom-built unit might be economical....

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Reply
Anonymous Poster
#6
In reply to #4

Re: Pressure Reducing station-Operating duration.

11/20/2009 4:49 AM

Well,to be more specific, whether with 5000 ppm silt level,does pressure reducing station can be recomended for feeding cooling auxiliary supply in hydroelectric project.

Reply
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#7
In reply to #6

Re: Pressure Reducing station-Operating duration.

11/20/2009 5:16 AM

I don't know yet, but there might be ways to accommodate the silt problem. In particular, the elastomer-lined valve idea might have a fighting chance. (Just as a sandblasting hose is rubber-lined.) I really don't know why you are asking this question; although I haven't solved it yet, it is clearly on the agenda.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Reply
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#10

Re: Pressure Reducing Station - Operating Duration

11/23/2009 2:53 AM

In the light of comments by PWSlack and TheProf, the pressure regulator approach I have been working on is not such a hot idea. You really would lose quite a lot of energy by just blowing it through a valve.

I understand the PAT concept, but I am not familiar enough with it to attempt a design selection. Now I'll go read some stuff.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Reply
Reply to Forum Thread 11 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

Anonymous Poster (4); PWSlack (3); The Prof (1); Tornado (3)