Anonymous Poster #1

Daily Target

06/30/2013 5:49 AM

Dear All

In construction for electrical is it feasible to plan daily target for all the activity? or need to generate s-curve? any advise.

Regards

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#1

Re: Daily target

06/30/2013 10:12 AM

Real men use daily targets.

S-curves are for sissies.

Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#2

Re: Daily Target

07/01/2013 3:31 AM

The most wonderful thing about target dates is the amazing whooshing sound they make as they go past.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Commentator

Join Date: May 2013
Posts: 86
Good Answers: 2
#3
In reply to #2

Re: Daily Target

07/01/2013 5:08 AM

LOL !!!!

Reply
Guru
Safety - Hazmat - New Member Engineering Fields - Retired Engineers / Mentors - New Member Engineering Fields - Piping Design Engineering - New Member Hobbies - DIY Welding - New Member Fans of Old Computers - PDP 11 - New Member

Join Date: Feb 2007
Location: Stronger Than The Storm
Posts: 2394
Good Answers: 203
#4

Re: Daily Target

07/11/2013 3:40 PM

In reference to the first part of your posting:

In construction for electrical is it feasible to plan daily target for all the activity? After many years of experience and even more projects and processes I have found that "It is difficult to remember your goal is to drain the swamp when you are up to your a_s in alligators". Daily targets only create more alligators nipping at your butt. Axiom: "Keep you butt out of trouble"!

or need to generate s-curve? any advise. The shortest distance between two points is a straight line. Any deviation from that is wasting even more time and resources.

Spend the time necessary to generate all this "paperwork/files" into productive "Git 'er done" time. Axiom: The speedometer is important, but what is most important is the odometer!

Good Luck, Old Salt

__________________
Any day on the green side of the grass is a GREAT DAY!, --- me +++++++++. I believe creativity is an inherent part of everyone. --- Kermit T. Frog
Reply Score 1 for Good Answer
Reply to Forum Thread 4 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

lyn (1); old salt (1); Pattabhiraman (1); PWSlack (1)

Previous in Forum: Compressors and More   Next in Forum: Simple Pressure Sensor/Switch - South Africa

Advertisement