ESTIMATE AND PLANNING

09/02/2007 12:25 AM

How can we calculate the accurate manpower required aganist a particular job. For eg... How much manpower is required for 100 ton steel structure fabrication? ....my question is whether any formula base we have for this calculation. If any body have please reply.

Register to Reply
User-tagged by 1 user
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Popular Science - Weaponology - New Member United Kingdom - Member - New Member

Join Date: May 2007
Location: Harlow England
Posts: 16512
Good Answers: 670
#1

Re: ESTIMATE AND PLANNING

09/02/2007 5:23 AM

Ha! I was going to be a smart arse and say 'do it yourself' but then I saw the 100ton ! Not my field really.

Maybe more info? Single storey?

__________________
health warning: These posts may contain traces of nut.
Register to Reply Off Topic (Score 5)
Guru
APIX Pilot Plant Design Project - Member - New Member

Join Date: Jun 2007
Location: Houston, Texas
Posts: 569
Good Answers: 8
#3
In reply to #1

Re: ESTIMATE AND PLANNING

09/02/2007 11:17 PM

100 tons is quite small for a structure, Del.

__________________
chtank
Register to Reply Off Topic (Score 5)
Guru
Popular Science - Weaponology - New Member United Kingdom - Member - New Member

Join Date: May 2007
Location: Harlow England
Posts: 16512
Good Answers: 670
#5
In reply to #3

Re: ESTIMATE AND PLANNING

09/03/2007 12:33 AM

It's big to a Cat...!

__________________
health warning: These posts may contain traces of nut.
Register to Reply Off Topic (Score 5)
Anonymous Poster
#2

Re: ESTIMATE AND PLANNING

09/02/2007 10:59 PM

See every fabrication job have many factors - design, location, finishing, time frame etc. Any how find the basic raw materials cost of the job. then count labour cost @ 30% - 40% of material cost, then calculate quantity of very skilled, skilled, semi skilled & unskilled man days. Now find local labour rates & divide labour cost by man days, you will find the required man power +10%. Put it in a bar chart if possible.

MILTON SIKDER, CGM, TSHPL

Register to Reply
Guru
Engineering Fields - Control Engineering - New Member China - Member - New Member

Join Date: Sep 2006
Location: CHINA
Posts: 2945
Good Answers: 14
#4

Re: ESTIMATE AND PLANNING

09/03/2007 12:11 AM

Its not a difficult job to work out, but it s really only a estimate work. you cannt calculate accurately it. it depends on various conditions, machine, skill, knowledge and sites and region etc. you can find a budget table in your region from local associaton.

and many software can be selected for it. for example exel or project etc.

Register to Reply
Member

Join Date: Aug 2007
Posts: 9
#6

Re: ESTIMATE AND PLANNING

09/03/2007 12:38 AM

I believe you are talking about structural steel fabrication. Productivity depends on type ( Light steel , medium steel and Heavy steel ) region ( Europe, Asia, Arab world) and yes offcourse on the man-incharge too.

Normally consider 60-70Mhrs /Ton for Light steel , 50-60Mhrs /Ton for medium steel and 20-40Mhrs /Ton Heavy steel I am giving you the range to accomodate other factors like region and personnel performences. These manhours are only for prefabrication works. For erection they will be different depending on various factors like height , type of joints, location- region, skill of manpower , etc.

Once you calculate the total Manhours then divide by 10hrs to get Mandays and thereafter calculate Manpower by dividing Mandays by duration.

Ex Medium Steel T = 100Tons

Manhours = 100x50 = 5000Mhrs

Hrs Per Day = 10Hrs

Mandays = 500MDays

Available duration is 30 days

Manpower Required = 16.7 ay 18

Now you should be knowing how to allocate welders , fitters, fabricators , grinders , helpers , riggers , foremen , etc- This will be Direct Manpower Only

Akram

Register to Reply
Commentator

Join Date: Aug 2007
Posts: 97
Good Answers: 3
#7

Re: ESTIMATE AND PLANNING

09/03/2007 12:55 AM

There is no set formulae to calculate man power required to weld 100 tons of steel, for there are many variables: 1) Process of Welding, 2) Thickness or weight per foot of work piece 3) Design of Weld joints, 4) Type of filler metal, 5) Position of Welding 6) Design of structure and whether any thermal treatment to work piece or weld is required. If you have answer to the above variables, some one would definetly help you by giving you the parameters of calculation. Mind you! If you want to weld steel structure in shop and on the location at site and at hieght, would vary a lot by cost. You may get help for man-power estimating from manual published by Gulf Publishing Company. Cost of welding varies country to country.

Register to Reply
Commentator

Join Date: Apr 2007
Posts: 55
#8
In reply to #7

Re: ESTIMATE AND PLANNING

09/03/2007 1:38 AM

Don't forget to allow for weather, unforeseeable problems, acts of war and God if you are bidding on the job and it has a performance clause that makes you pay if you run over past the due date for the end of the job.

If your crew is used to to working in 30 C summers and you get 3 weeks of 40 C weather the productivity drops through the floor. The same is true for a crew used to 40C in 50C weather or even worse. Two weeks of thunderstorms will drive you mad as well.

Good Luck

Gordon

Register to Reply
Guru
Engineering Fields - Systems Engineering - New Member Hobbies - Model Rocketry - New Member

Join Date: Dec 2006
Location: Long.92E,Lat.26N
Posts: 1336
Good Answers: 14
#9

Re: ESTIMATE AND PLANNING

09/03/2007 1:41 AM

Depends on these:

  • How callous the original designer :-was he lazy -and used only 2 or 3 Heavy Standard sections( fast fabrication)---or was he absolutely a penny pincher-- never overdesigned and used all kinds of optimum/minimum sections(Slow Fab.)
  • How generously equipped was your fabshop? EOT cranes,Manipulators,rotators?
  • How generous was intermediate storage in your fabshop floor?
  • How powerful your Gas Cutter/AirPlasma Cutter and were there enough of these with capable operators?Were Consumables amply/readily issued
  • Were there a good size mix of Powerful MIG/MAG, SMAW,TIG,Stick Weld sets?
  • Was there a Chaser/Despatcher/Expediter constantly monitoring at various stages of operation?

No formulas possible -- If somebody tells you these are possible --take with a pinch of salt .

Register to Reply
Power-User
Engineering Fields - Piping Design Engineering - Environmental Contractor United States - Member - Born, raised and proud to be Texan Safety - Hazmat - New Member

Join Date: Nov 2006
Location: South of Alabama
Posts: 196
#10

Re: ESTIMATE AND PLANNING

09/03/2007 4:42 PM

Welcome vinodincr4,

Do you have within your organization staff who have performed the type of work you are bidding. They are an invaluable resource even if their experience is not identical to the project at hand.

I can't imagine competitively bidding work I have no experience in or access to someone who does. I do enjoy stretching the envelope where I have just enough experience to grow into a new project.


Good luck

__________________
Believe none of what you hear......and only half of what you see.
Register to Reply
Associate

Join Date: Jul 2007
Posts: 31
#11

Re: ESTIMATE AND PLANNING

09/03/2007 6:54 PM

I recommend you using statistics, you may use a calculator or MS Excel, consider this, how much can an employee produce per hour or day, once you havve the answer, devide 100 ton for the amount produce by one person and that should tell you howmany employees you need.

Also, you need to consider age, experience physical strength or skill.

Register to Reply
Anonymous Poster
#12

Re: ESTIMATE AND PLANNING

09/03/2007 10:48 PM

'Berger Estimating manuals" used to carry ways to give you

answers based on detail or on general 'per sq. ft.` costs in the U.S.

There was man/hour data once you provided some construction details.

Register to Reply
Anonymous Poster
#13

Re: ESTIMATE AND PLANNING

12/11/2009 3:40 AM

how to calculation of manpower for steel fabricatio in trans

Register to Reply Off Topic (Score 5)
Participant

Join Date: Aug 2010
Posts: 3
#14

Re: ESTIMATE AND PLANNING

08/24/2010 4:02 AM

www.costeng.com people seem to be developing some interesting estimating software that provides automatic access to manhour databases. I see they have modules for piping and I believe other disciplines are 'in the wind'

Register to Reply
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#15

Re: ESTIMATE AND PLANNING

09/07/2022 7:36 AM

It's commercially sensitive information and unlikely to be found on an on-line forum, or anywhere else for that matter. These things are best home-brewed by the <...we...> in question.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Register to Reply Score 1 for Off Topic
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#16
In reply to #15

Re: ESTIMATE AND PLANNING

09/08/2022 12:33 AM

Good grief. This thread is 15 years old, and the most recent post until now is 12 years old. Geez. If you want to do archaeology, go to Bumfuk, Egypt.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Register to Reply Score 2 for Off Topic
Register to Reply 16 comments
Copy to Clipboard

Users who posted comments:

Akram Husain (1); Anonymous Poster (3); chtank (1); cnpower (1); Gordon Couger (1); johnk (1); MUKULMAHANT (1); Pepper (1); PWSlack (1); saca03142 (1); Tornado (1); user-deleted-1100 (1); user-deleted-1105 (2)

Previous in Forum: Piezo electric   Next in Forum: power pack problem

Advertisement