Need help! I have 6"dia. riser for 1Basement to 12flr(for sprinklers ground-12th flr) & another 6"dia. riser that will run from basement to 25 flr (for sprinklers 13-25th flr) from a common header (typ. flr. elev-3.6m).On original design there are no PRV installed on system, which is not advisable, then i am planning to install PRV to control the required pressure for each flrs. At where should i placed the PRV, on the riser?, or on each floor control zone valve?, how should i tell exactly the location of PRV?